Monday, June 16, 2025
Rabotec Group || Meeting your needs with perfection
  • Home
  • About Rabotec
  • News
  • Projects
    • Mining
    • Civil Construction
    • SMPEIP
    • Haulage
    • Bulk Earth Works
    • 2018 (Year)
    • 2019-2020 (Year)
  • Contact
  • Home
  • About Rabotec
  • News
  • Projects
    • Mining
    • Civil Construction
    • SMPEIP
    • Haulage
    • Bulk Earth Works
    • 2018 (Year)
    • 2019-2020 (Year)
  • Contact
No Result
View All Result
Rabotec Group || Meeting your needs with perfection
No Result
View All Result
Home Projects 2018 (Year)

Plant Maintenance and Corrosion Control

Plant Maintenance and Corrosion Control

Client: Asanko Gold Mine
Project Year: 2018
Location: Obotan Mine, Ghana
Project Description: Corrosion is a worldwide crucial problem that strongly affects natural and industrial environments. Today, we have full control over the corrosion and do regular plant maintenance.

ShareTweetPin

Related Posts

Bulk Earth Works

Works at Prestea Sankofa Gold Ltd (PSGL) Tailings Facility

Asanko Gold Mill Project 5M
Asanko Gold Mine Projects

Asanko Gold Mill Project 5M

Asanko Gold Processing Plant Construction
Asanko Gold Mine Projects

Asanko Gold Processing Plant Construction

Construction of Secondary Crusher Platform at Asanko Gold Mine
Asanko Gold Mine Projects

Construction of Secondary Crusher Platform at Asanko Gold Mine

Newmont Golden Ridge Akyem Gold Processing Infrastructure Project (Oxide crusher)
Mining

Construction of Secondary Crusher Platform at Asanko Gold Mine

Haulage of 1,468,750 tons of ore over a 33km haul road from Esaase Pit to Obotan Mine.
Asanko Gold Mine Projects

Haulage of 1,468,750 tons of ore over a 33km haul road from Esaase Pit to Obotan Mine.

Load More

Popular News

  • Asanko Photo Update

    0 shares
    Share 0 Tweet 0
  • Haulage of 1,468,750 tons of ore over a 33km haul road from Esaase Pit to Obotan Mine.

    0 shares
    Share 0 Tweet 0
  • Bissa Gold Project – Mill Installation and Commissioning

    0 shares
    Share 0 Tweet 0
  • Works at Prestea Sankofa Gold Ltd (PSGL) Tailings Facility

    0 shares
    Share 0 Tweet 0
  • Construction of Tailings Storage Facility Stage 5 Raise

    0 shares
    Share 0 Tweet 0

By Categories

  • 2018 (Year)
  • 2019-2020 (Year)
  • Asanko Gold Mine Projects
  • Bulk Earth Works
  • Civil Construction
  • Haulage
  • Mining
  • News
  • Prestea Sankofa
  • Projects
  • Sierra Leone
  • SMPEIP
  • TSF
  • TSF Maintenance
Facebook Youtube LinkedIn
Rabotec Group - Staging Site

Recent News

  • Works at Prestea Sankofa Gold Ltd (PSGL) Tailings Facility
  • Asanko Gold Mill Project 5M

Our Social Media

© 2025 - All Rights Reserved Rabotec Ghana Limited

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In

Add New Playlist

No Result
View All Result
  • #2881 (no title)
  • About Rabotec
  • Cart
  • Checkout
  • Contact
  • CONTACT US
  • Home
  • HOME
  • Information & Services
  • My account
  • OUR NEWS
  • OUR PROJECTS
  • OUR SERVICES
  • Rabotec Group
  • Shop
  • Showcase
  • SUSTAINABILITY
  • WHO WE ARE
  • About Us
    • Partners
    • Team
    • Testimonials
  • Services
    • Construction Service Page
  • News

© 2025 - All Rights Reserved Rabotec Ghana Limited

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?
Go to mobile version