Project Date: February 2023 – January 2024
Project Scope: Construction of certain aspects of the stage 7 Raise of the TSF, Phase 1 Area 1. Rabotec constructed the TSF from Phase 1, raise to throughout to the current Stage. The scope of work includes grounds preparation, removal of top soil, rockfill, Geomembrane rubber lining, etc.